Who's Online Now
0 registered members (), 13 guests, and 2 spiders.
Key: Admin, Global Mod, Mod
May
S M T W T F S
1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31
Newest Members
vacheera, KM Elevator, Shawzee, ChurchGuy, Luis Mariano
8461 Registered Users
Forum Statistics
Forums13
Topics6,515
Posts36,880
Members8,461
Most Online117
Jan 16th, 2020
Previous Thread
Next Thread
Print Thread
#34159 - 11/02/22 10:50 PM Dover DMC-1M  
Joined: Jan 2019
Posts: 80
M2RE Offline
Chilling
M2RE  Offline
Chilling

Joined: Jan 2019
Posts: 80
Hey guys, I am having a issue with a dover dmc. The unit starts and before it even moves it drops all UP relays all at the same time. I checked slowdowns but they are good. Any suggestions? No faults are coming up. I already did a hoistway setup a few times. Replaced up telats and down relays and fast relay. The elevator never goes into service, it just lowers to bottom floor, then tries to start and drops out quickly.

#34163 - 11/03/22 08:11 AM Re: Dover DMC-1M [Re: M2RE]  
Joined: Nov 2009
Posts: 413
Johnny Offline
Journeyman
Johnny  Offline
Journeyman

Joined: Nov 2009
Posts: 413
Portland. Oregon
Will it run up on inspection? After hoistway setup, does it show in service?

#34164 - 11/03/22 10:18 AM Re: Dover DMC-1M [Re: M2RE]  
Joined: Jan 2019
Posts: 80
M2RE Offline
Chilling
M2RE  Offline
Chilling

Joined: Jan 2019
Posts: 80
It does run up in inspection with no problems. After it levels it does not go in service because hall calls are deactivated at all times. Is not like it goes out of service after it foes the up-stop problem

#34165 - 11/03/22 01:47 PM Re: Dover DMC-1M [Re: M2RE]  
Joined: Apr 2017
Posts: 96
UpandDown2321 Offline
journeyman
UpandDown2321  Offline
journeyman

Joined: Apr 2017
Posts: 96
Last time I had something close to that CLC had to be changed

#34167 - 11/03/22 03:20 PM Re: Dover DMC-1M [Re: M2RE]  
Joined: Jan 2019
Posts: 80
M2RE Offline
Chilling
M2RE  Offline
Chilling

Joined: Jan 2019
Posts: 80
UpandDown I am thinking the same thing since CLC Outputs and commands RUN relays. Will keep you guys updated

#34171 - 11/03/22 06:00 PM Re: Dover DMC-1M [Re: M2RE]  
Joined: Jun 2015
Posts: 30
firbug13 Offline
newbie
firbug13  Offline
newbie

Joined: Jun 2015
Posts: 30
Did you check the floor count? If it doesn't match it won't go on auto. Change to 3 stop or 4 stop whatever it is.

#34175 - 11/03/22 06:47 PM Re: Dover DMC-1M [Re: M2RE]  
Joined: Jan 2019
Posts: 80
M2RE Offline
Chilling
M2RE  Offline
Chilling

Joined: Jan 2019
Posts: 80
Hey guys, today I went back and the CLC had COLD START fault. Had to do all the parameters and learned selector and door. Adjusted correct speeds and after that it ran with no issues. That was literally the fix. I will need to get new 3VDC battery and a couple of beers. Thanks for the help everyone.


Photo Gallery
PECCO PH5000 Overspeed Governor
Drive sheave
The best helper.
Rotary Oildraulic
Old Otis badge.
Brakes,Coil,Rotor
KONE MX10 repair tool kit
Powered by UBB.threads™ PHP Forum Software 7.6.0
Page Time: 0.024s Queries: 16 (0.004s) Memory: 2.6951 MB (Peak: 2.8722 MB) Zlib disabled. Server Time: 2024-05-04 10:55:44 UTC