The small green circuit board (PS241F) had a questionable tantalum capacitor so i soldered in a new one.
I also installed a new power supply module which i keep as spares.
A pull switch which had been removed and replaced by a jumper wire had a bad terminal connection.
The call stations and electric strikes all have power now.
The call station lockout switches are being eliminated.
As the lift will now be serving only 3 stops, two limit switches and their corresponding relays are being removed as well.
Because the lift is not for public use i will also be integrating a manual switch to provide the needed 12 volts to lower the platform in the event of a power failure.
The power failure circuit (and) relay is being reconfigured to suit.
I have worked nearly all afternoon on the revised schematic and i have come to realize that all the skilled tradespeople i grew up with or worked beside have now past.
Thanks again,