Joined: Apr 2020
Posts: 520
Likes: 2
addict
addict
Joined: Apr 2020
Posts: 520
Likes: 2
I just learned of the recent fatality of a young man working as an elevator helper. My thoughts and sorrow go out to all those who knew and cared about him. Our business is a dangerous one but the dangers can be countered by certain practices. It is my understanding that his life was lost during an elevator recable job. This struck home to me because my helper and I have a recable job scheduled for next week. I was hoping to get a dialog going where we could state one or two things we've learned through the years that make for a safe and smooth recable job. I was taught as a helper after hoisting the car to get your new runby to always leave one cable attached and to trip the governor during the cable job. Please do not post any comments in regards to the fatality. This post is about moving forward. Thanks

Joined: Mar 2016
Posts: 270
Likes: 2
L
Elevator guy
Elevator guy
L Offline
Joined: Mar 2016
Posts: 270
Likes: 2
Set the car in the safeties and wrap a couple of slings from the cross head and rail brackets for extra measure

Joined: Jun 2018
Posts: 102
E
member
member
E Offline
Joined: Jun 2018
Posts: 102
set safeties, steel choker around cross head and rail bracket, change one rope at a time so there is always several still holding the car

Joined: Feb 2013
Posts: 800
J
old hand
old hand
J Offline
Joined: Feb 2013
Posts: 800
In the way back, we landed the counterweights on some type of blocking or rail clamps sufficient to hold the weight. Hung the car off of the machine beams, then hoisted it up to account for rope stretch( back then it was 9" for every one hundred feet of rope, or 6" if using pre-stretched rope. Always set the safties. If you could land the counterweights high enough, the car top was at the top floor level. This was for straight over traction. For 2 to 1 you had to hang the car high enough to access the shackles. Which of course had to be poured with molten babbitt. With the advent of the wedge shackles, things became looser and guys started to improvise, doing one rope at a time, then going back in with a rope clamp to hang the car and shorten the cables at least once and maybe more, depending on the rise. The wedge shackles changed everything, the tried and true went by the wayside for quicker and easier. Safety of the crews also sometimes goes out the window. I am not denigrating the wedge type, just saying, take some time to stay safe.

Joined: Mar 2014
Posts: 215
S
enthusiast
enthusiast
S Offline
Joined: Mar 2014
Posts: 215
Setting safeties and slinging car to rail brackets or over head steel. We used to use 2 4x4s to land the counterweight to account for the stretch. When it comes to safety, 2 is 1 and 1 is none, meaning if you don't have a backup, you flat out have nothing.

Joined: Jan 2012
Posts: 909
jkh Offline
4 Ever Learning.
4 Ever Learning.
Joined: Jan 2012
Posts: 909
My condolences to the loved ones of this person,

I would also to acknowledge everyone who participates in furthering this industry.

Thank you

For me, I can’t image doing anything else!

BEST JOB EVER!

JKH


Make good choices,

JKH

Link Copied to Clipboard
Photo Gallery
service tool laptop
service tool laptop
by dunkdadrunk, February 4
rip orona
rip orona
by epic_ecodisc, January 7
what controller is this?!
what controller is this?!
by Alex_ELMAN, December 4
HW PM
HW PM
by Chris, January 13
PECCO PH5000 Overspeed Governor
PECCO PH5000 Overspeed Governor
by stankap, September 24
Drive sheave
Drive sheave
by jkh, October 10
The best helper.
The best helper.
by Adrian, August 8
Powered by UBB.threads™ PHP Forum Software 8.0.0
(Release build 20240826)
Responsive Width:

PHP: 8.3.33 Page Time: 0.035s Queries: 26 (0.018s) Memory: 3.0204 MB (Peak: 3.5922 MB) Data Comp: Off Server Time: 2026-09-20 22:17:27 UTC
Valid HTML 5 and Valid CSS