If the machine is flipped, this would put the rope drop in a different place- machines are left hand/ right hand. Now that the rope drop is in a different location, the machine will have to be moved to allow the rope drop to be ceneter over the holes/ rails again. This new location of the machine may not allow the new machine to be sitting on the building supports properly.