Currently in a situation where several 28 floor elevators have been sitting for years (15-20). They want to take them out of service. I've lowered smaller rise cars with a custom chain fall before but these are over 1000 feet tall. Looking for options on how to lower the cars after landing the counterweights. Cutting the cables and letting them fall is not an option this time however it would be cool.