Who's Online Now
0 members (), 33 guests, and 2 robots.
Key: Admin, Global Mod, Mod
September
S M T W T F S
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30
Newest Members
Josephs, Javy89, Ropeguy67245, kywewa, Ingvar
10,040 Registered Users
Forum Statistics
Forums13
Topics7,385
Posts40,944
Members10,040
Most Online3,137
Apr 9th, 2026
Previous Thread
Next Thread
Print Thread
#17269 06/08/16 10:22 PM
Joined: Mar 2016
Posts: 2
G
stranger
stranger
G Offline
Joined: Mar 2016
Posts: 2
Currently in a situation where several 28 floor elevators have been sitting for years (15-20). They want to take them out of service. I've lowered smaller rise cars with a custom chain fall before but these are over 1000 feet tall. Looking for options on how to lower the cars after landing the counterweights. Cutting the cables and letting them fall is not an option this time however it would be cool.

Joined: Mar 2014
Posts: 215
S
enthusiast
enthusiast
S Offline
Joined: Mar 2014
Posts: 215
Heard about this once, though I did not see it. Counterweights were landed, and they had staged chain fall locations through the hoistway using counter weight bracket locations, or newly made pick points, depending on where in the hatch they were. Was a 4 chain fall jump before they had the car at the bottom.

I have always wondered if a sky climber couldn't be used to lower a stripped car...take the cab off to lighten the load, take it to the top with sky climber and cables, rig it, and lower the frame back down on a climber...

Joined: Jan 2014
Posts: 132
D
member
member
D Offline
Joined: Jan 2014
Posts: 132
Well we planked across between beams an made solid floor at top of hoist way an took cab an car apart right there.Also used a air operated tuger .

Joined: May 2011
Posts: 338
A
ABE Offline
Mechanic
Mechanic
A Offline
Joined: May 2011
Posts: 338
The large Tirack cable climber hoist will pick 4,400 lbs. You would have to run a 1,000 ft temporary hoist cable and a temporary 3 phase travel to your machine room or secondary space. It runs 24 fpm so it would be a lot faster than a chain fall.

Joined: Aug 2011
Posts: 75
V
journeyman
journeyman
V Offline
Joined: Aug 2011
Posts: 75
28 floors and 1000 feet tall? What the hell is the floor to floor height, 36 feet?

Joined: Aug 2011
Posts: 563
U
addict
addict
U Offline
Joined: Aug 2011
Posts: 563
Originally Posted By: VerticalTechNY
28 floors and 1000 feet tall? What the hell is the floor to floor height, 36 feet?


High rise with express zone plus 28 floors?


Link Copied to Clipboard
Photo Gallery
service tool laptop
service tool laptop
by dunkdadrunk, February 4
rip orona
rip orona
by epic_ecodisc, January 7
what controller is this?!
what controller is this?!
by Alex_ELMAN, December 4
HW PM
HW PM
by Chris, January 13
PECCO PH5000 Overspeed Governor
PECCO PH5000 Overspeed Governor
by stankap, September 24
Drive sheave
Drive sheave
by jkh, October 10
The best helper.
The best helper.
by Adrian, August 8
Powered by UBB.threads™ PHP Forum Software 8.0.0
(Release build 20240826)
Responsive Width:

PHP: 8.3.33 Page Time: 0.021s Queries: 26 (0.005s) Memory: 3.0193 MB (Peak: 3.5928 MB) Data Comp: Off Server Time: 2026-09-21 10:59:30 UTC
Valid HTML 5 and Valid CSS