Who's Online Now
0 members (), 16 guests, and 1 robot.
Key: Admin, Global Mod, Mod
September
S M T W T F S
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30
Newest Members
Josephs, Javy89, Ropeguy67245, kywewa, Ingvar
10,040 Registered Users
Forum Statistics
Forums13
Topics7,385
Posts40,945
Members10,040
Most Online3,137
Apr 9th, 2026
Previous Thread
Next Thread
Print Thread
#2957 03/13/12 08:52 PM
Joined: Sep 2009
Posts: 404
Administrator
Administrator
Joined: Sep 2009
Posts: 404
The state sent the yearly requirement for Gen 2 elevators we currently have on service:

" The operation of the coated steel belt monitor shall be tested to verify proper functionality of the device. California Labor Code 7318: [Ref. Circular Letter E-10-04]"

How is Otis testing these belt monitoring devices to satisfy the State requirements?

Here's the link to the circular.
http://www.dir.ca.gov/dosh/E-10-04.pdf

Is there a testing procedure that simulates a failure on the monitoring device which causes the elevator to shut down?

Last edited by Administrator; 03/13/12 09:02 PM.
Joined: Apr 2011
Posts: 565
Vic Offline
jack of all depts
jack of all depts
Joined: Apr 2011
Posts: 565
I've never seen one, but It's measuring the electrical continuity of the belts, right? Sort of like a big ohmmeter? So couldn't you lift one of it's monitoring "leads" off somewhere, to simulate a broken belt?

Joined: Sep 2009
Posts: 404
Administrator
Administrator
Joined: Sep 2009
Posts: 404
I'm not sure if the monitoring device measures the continuity of the belts or just measures the tension of each belt. I know Otis has a tool that measures the continuity of each belt. Maybe an Otis mechanic can chime in on how the Gen 2 belt monitoring works and how they do the yearly belt inspection.

Joined: Apr 2010
Posts: 101
J
Troubleshooter
Troubleshooter
J Offline
Joined: Apr 2010
Posts: 101
"Pulse" unit attaches to each lay and monitors continuity. Disconnect the unit to simulate a broken lay.

Joined: Oct 2010
Posts: 280
G
GreenPants
GreenPants
G Offline
Joined: Oct 2010
Posts: 280
the pulse unit measures the resistance of each lay in the belt. after a learn procedure for the belt length the unit monitors for excessive wear by resistance changes, opens, or short to ground id the vinyl coating is damaged. dont touch the termination blocks if its working or your asking for trouble. one flash on each used termination means everything is ok. unplugging the unit will test it, but im pretty sure there is a test button on the board. these things are very sensitive but once they are in and working you shouldnt have a problem.

Joined: Sep 2009
Posts: 404
Administrator
Administrator
Joined: Sep 2009
Posts: 404
Thanks for the help on this issue. I need to go and check out this job next week. At least I know why I need to look at now.


Link Copied to Clipboard
Photo Gallery
service tool laptop
service tool laptop
by dunkdadrunk, February 4
rip orona
rip orona
by epic_ecodisc, January 7
what controller is this?!
what controller is this?!
by Alex_ELMAN, December 4
HW PM
HW PM
by Chris, January 13
PECCO PH5000 Overspeed Governor
PECCO PH5000 Overspeed Governor
by stankap, September 24
Drive sheave
Drive sheave
by jkh, October 10
The best helper.
The best helper.
by Adrian, August 8
Powered by UBB.threads™ PHP Forum Software 8.0.0
(Release build 20240826)
Responsive Width:

PHP: 8.3.33 Page Time: 0.036s Queries: 26 (0.016s) Memory: 3.0183 MB (Peak: 3.5897 MB) Data Comp: Off Server Time: 2026-09-21 21:02:16 UTC
Valid HTML 5 and Valid CSS