Who's Online Now
0 members (), 22 guests, and 2 robots.
Key: Admin, Global Mod, Mod
September
S M T W T F S
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30
Newest Members
Josephs, Javy89, Ropeguy67245, kywewa, Ingvar
10,040 Registered Users
Forum Statistics
Forums13
Topics7,385
Posts40,939
Members10,040
Most Online3,137
Apr 9th, 2026
Previous Thread
Next Thread
Print Thread
#34627 01/27/23 04:30 PM
Joined: May 2022
Posts: 39
A
newbie
newbie
A Offline
Joined: May 2022
Posts: 39
What methods do you use for T- rail alignment?
I do mostly low-rise installs 2-4 floors. residential and commercial 8-12-15lb rails

methods I use: ( nothing fancy at all)
- laser to the rail with a measuring tape.
- c clamp top of the rail with a string and plumb bob, measuring tape.
- 7 ft level, cut conduit for DBG.


The better the effort, the better the result.

Joined: Dec 2010
Posts: 639
Likes: 4
E
addict
addict
E Offline
Joined: Dec 2010
Posts: 639
Likes: 4
Interesting question. Old school here;
Target wires hung from the overhead on piano wire with fish plate weights to steady them in the pit. A number of ways to secure the wires, but once set and secured, they’ll not move. Brackets were set (and anchored) to centerline off of these wires. Rail gage with 1” dot from the rail face was used.
Yeah two stops were easier with the plumb, but a straight piece of 3/4” conduit beveled on one end was used for the BG stick and rail facing one to the other no matter what the number of floors. I’m sure there are more “modern” ways today to achieve a plumb and faced rail job which (should) equals a smooth ride. Never used a level of any sort for rail install.

Joined: Dec 2015
Posts: 1,766
Likes: 11
I
ElevatorPractitioner
ElevatorPractitioner
I Offline
Joined: Dec 2015
Posts: 1,766
Likes: 11
I’d pretty much second that except we did always use at least a 4’ level to “rock” the stacked rails straight before nailing down the fish plate bolts. I’ve never been a fan of lasers for rail jobs. The PLS lasers they were using 10 years ago weren’t that accurate but I wouldn’t be surprised if there was something good enough now.

Joined: Aug 2017
Posts: 579
Likes: 6
E
addict
addict
E Offline
Joined: Aug 2017
Posts: 579
Likes: 6
I'm a huge fan of plumb bobs. If it's not windy, plumb bobs don't lie. I never did trust lasers, and I always found it easier to see a string line than that invisible laser

Joined: Aug 2017
Posts: 579
Likes: 6
E
addict
addict
E Offline
Joined: Aug 2017
Posts: 579
Likes: 6
And I also like conduit for checking dbg.

Although I never used one when installing, I now use a bosch laser tape measure somewhat frequently for various things like estimating lengths of cable for a job or filling out survey forms. Those things are incredibly accurate (to the 32nd of an inch) and I wouldn't hesitate to use one if I was installing again. Man how nice it would have been to simply hold it on the rail bracket and get an instant measurement that's accurate when setting up my top rail brackets instead of twisting and stretching trying to hold a tape measure in place, no bowing in it and read the darn thing accurately while on the extension ladder jammed at an angle into the shaft corner. This is what it must feel like to be a retired mechanic that installed elevators with square bolt heads and all hand tools watching the new generation throw stuff in twice as fast with battery powered impact wrenches and be thinking how nice it would've been to have had that modern technology when they were doing it.

Joined: Jan 2010
Posts: 671
D
addict
addict
D Offline
Joined: Jan 2010
Posts: 671
Good info here! Here’s a trick I was taught that made me go WOW that’s the easiest way to do that. When you want to find center of rails to do fronts off temp skip. Get a stick of 3/4 conduit notch about 1/2 inch off one end 1/2 way thru. This end goes on rail and out the opening. Put a pencil on the end and draw an arc on the floor. Now do the same on the other rail. The two arcs will cross each other in 2 places. Draw a straight line thru the 2 Xs back to edge of hoistway. This will be dead center of your rails every time. Length of conduit will depend on how far back your rails are but you’ll see real quick how long you need.

Last edited by danzeitz; 02/03/23 03:33 AM.
Joined: Aug 2014
Posts: 148
Likes: 1
K
member
member
K Offline
Joined: Aug 2014
Posts: 148
Likes: 1
laser and a Plum-bob


I like elevators and cars. Be Smart Work Safe!

Link Copied to Clipboard
Photo Gallery
service tool laptop
service tool laptop
by dunkdadrunk, February 4
rip orona
rip orona
by epic_ecodisc, January 7
what controller is this?!
what controller is this?!
by Alex_ELMAN, December 4
HW PM
HW PM
by Chris, January 13
PECCO PH5000 Overspeed Governor
PECCO PH5000 Overspeed Governor
by stankap, September 24
Drive sheave
Drive sheave
by jkh, October 10
The best helper.
The best helper.
by Adrian, August 8
Powered by UBB.threads™ PHP Forum Software 8.0.0
(Release build 20240826)
Responsive Width:

PHP: 8.3.33 Page Time: 0.018s Queries: 28 (0.005s) Memory: 3.0293 MB (Peak: 3.5927 MB) Data Comp: Off Server Time: 2026-09-20 15:22:10 UTC
Valid HTML 5 and Valid CSS