Well we are Moding ours. Lowrise side was 4-- 12 stops. 1 and 4 hoistway are being converted to electrical chases.Cars 2 and 3 are being moded. As the building is being converted to data storage. The 4 cars on the 18 floor high rise side cars 5 and 6 removed divider beams relocated and 10K lbs HW geared frate installed. This car will now stop at every floor with 12ft Courion byparting doors. Cars 6 and 7 will be Moded too. We are using Motion I box controll with GAL MOVFR operators on new cabs. The Westinghouse gearless machines are recondishioned on site. Why cheeers could be heard as the old controllers hit the scrap dumpster. It was kind of sad to see 4 gearless machines hit the scrap yard. We also converted and old 3Klbs Westinghouse hydro (with the old round tank) into a 20Klbs. New Jack, rails well everything but in the same old footprint. Hardest part of the job was stacking 20Klbs in that small of space. We are currently about to finish the second lowrise car and the new 10Klbs 18 stop on the highrise side. Whith the 2 highrise side Mods next.