Who's Online Now
0 members (), 29 guests, and 3 robots.
Key: Admin, Global Mod, Mod
September
S M T W T F S
1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30
Newest Members
Josephs, Javy89, Ropeguy67245, kywewa, Ingvar
10,040 Registered Users
Forum Statistics
Forums13
Topics7,385
Posts40,944
Members10,040
Most Online3,137
Apr 9th, 2026
Previous Thread
Next Thread
Print Thread
#38831 01/20/25 04:03 PM
Joined: Nov 2016
Posts: 115
G
member
member
G Offline
Joined: Nov 2016
Posts: 115
I have a unique job I have been sourced with. Replacing rails on a dumbwaiter. It sounds simple enough, right? This job is 180 miles out in the Gulf of Mexico, and I do not know if it will be possible to pull 16' rails out of the shaft.

I have a question regarding rails lengths. Do 16' rails provide anything other than less rails vs a 8' rail? Looking at the drawings I can start with a 3.5' rail at the bottom and with the bracket spacing be OK with the 8' rails. Should this be signed off by an engineer?

Joined: Dec 2010
Posts: 639
Likes: 4
E
addict
addict
E Offline
Joined: Dec 2010
Posts: 639
Likes: 4
Goat-

I think you’ll find it easier to cut and pull rails out than installing new. Only replacing rails? Hmm.

RE The “drawings” for the job. What does the rail schedule show? 3’-5” starter, but then what?
I’d imagine with a DW and its limited load capacities, 8 footers would be fine as long as you don’t end up with a fish plate right at the bracket, but what does the plan call for? Are 8lb rails on the schedule, or 15lb?
If the drawing you have is the “approved plan”, you’re kind of stuck with what it calls out for unless reviewed and re approved.
But here are a couple of my thoughts.;
How many stops and what’s the rise? Not knowing the structure you’re going to be tackling (oil platform?), is there a chance of going through the DW roof if it’s accessible? Or cutting approx 13’ high through a side wall to create an entrance point for the 16’s or 8’s? (And to remove the old rails).
Kind of tough to survey the job, being 180 miles out to the (proposed) Gulf of America.

Joined: Jan 2010
Posts: 671
D
addict
addict
D Offline
Joined: Jan 2010
Posts: 671
You should be fine.

Joined: Nov 2016
Posts: 115
G
member
member
G Offline
Joined: Nov 2016
Posts: 115
Originally Posted by elmcannic
Goat-

I think you’ll find it easier to cut and pull rails out than installing new. Only replacing rails? Hmm.

RE The “drawings” for the job. What does the rail schedule show? 3’-5” starter, but then what?
I’d imagine with a DW and its limited load capacities, 8 footers would be fine as long as you don’t end up with a fish plate right at the bracket, but what does the plan call for? Are 8lb rails on the schedule, or 15lb?
If the drawing you have is the “approved plan”, you’re kind of stuck with what it calls out for unless reviewed and re approved.
But here are a couple of my thoughts.;
How many stops and what’s the rise? Not knowing the structure you’re going to be tackling (oil platform?), is there a chance of going through the DW roof if it’s accessible? Or cutting approx 13’ high through a side wall to create an entrance point for the 16’s or 8’s? (And to remove the old rails).
Kind of tough to survey the job, being 180 miles out to the (proposed) Gulf of America.



The original approved drawings show brackets at 8', 23', and 37' 1/4". Hence my thought of starting with a 3.5' rail, and missing the brackets with the fish plates.

Pulling the old rails is a non-issue, as we will would cut them to whatever they need.

2 stops around 27' of travel. This customer tends to overthink as it is in the oil/gas industry. There are gouges in the rails, from the slackrope safety engaging, which they want replaced. My original proposal to them was to simply repair the gouges, as that is a standard repair anywhere in the world. They wanted 2 proposals one for repair and 1 for replacement.

I talked them into the standard rail file repair.


Link Copied to Clipboard
Photo Gallery
service tool laptop
service tool laptop
by dunkdadrunk, February 4
rip orona
rip orona
by epic_ecodisc, January 7
what controller is this?!
what controller is this?!
by Alex_ELMAN, December 4
HW PM
HW PM
by Chris, January 13
PECCO PH5000 Overspeed Governor
PECCO PH5000 Overspeed Governor
by stankap, September 24
Drive sheave
Drive sheave
by jkh, October 10
The best helper.
The best helper.
by Adrian, August 8
Powered by UBB.threads™ PHP Forum Software 8.0.0
(Release build 20240826)
Responsive Width:

PHP: 8.3.33 Page Time: 0.020s Queries: 22 (0.004s) Memory: 3.0141 MB (Peak: 3.5926 MB) Data Comp: Off Server Time: 2026-09-21 13:39:02 UTC
Valid HTML 5 and Valid CSS