All great advise. We maintain a bunch of these jobs and they run well. The air up mufflers and the multi stage upside down pistons are the most trouble. But with the repack tool from ADAMS and down time for repack and clean up (21/2 to 3 days) figured into your maintenance you will do fine. grin